A GPU server with whole cards glowing in a rack

Solutions Technical solutions GPU computing

GPU compute plan

Accelerated compute, rented as needed, a full range of machines

18 GPU servers are on sale, from RTX 4090 to H200. Each card is dedicated and not split. Nodes are in the United States, Japan and Singapore, with standard delivery in 30 to 60 minutes.

  • Whole cards, not split
  • One card to eight in parallel
  • RTX 4090, 5090, H100 and H200
  • Standard delivery in 30 to 60 minutes

Help with drivers and the runtime. Standard delivery in 30 to 60 minutes

Capacity ladder: from one-card inference to eight-card training

Five roles, from one card upward. Specs and the monthly price follow the product page.

One-card start

US-DAL-GPU-4090x1-i9-14900K

Core i9-14900K·24C / 32T 96G 2TB NVMe Global BGP 1G / 不限流量

$799 /mo

Order

Four-card start

US-DAL-GPU-5090x4-75F3x2

EPYC 75F3 x 2·64C / 128T 512G 960GB SSD×2 + 8TB NVMe×2 Global BGP 10G / 不限流量

$1459 /mo

Order

Eight RTX 4090

US-SEA-GPU-4090x8-7763x2

EPYC 7763 x 2·128C / 256T 512G 960GB SSD + 3.84TB NVMe Global BGP 1G / 不限流量

$3369 /mo

Order

Eight H100

JP-TYO-GPU-H100x8-8460Yx2

Xeon Platinum 8460Y x 2·80C / 160T 2048G 19.2TB NVMe Global BGP 1G / 不限流量

$12229 /mo

Order

Eight H200

JP-TYO-GPU-H200x8-8460Yx2

Xeon Platinum 8460Y x 2·80C / 160T 2048G 1.92TB NVMe×8 Global BGP 10G / 不限流量

$16129 /mo

Order

18 GPU servers are on sale, from 1 card to 8 in parallel, with 96 GB to 2048 GB of memory. Rooms include Dallas, Seattle, Los Angeles, Ashburn, Chicago, Tokyo and Singapore.

Four things to settle before a GPU project

GPU projects usually stall on memory, data supply, sharing, or the room power and cooling.

Check GPU memory before compute

Too little GPU memory means the model will not load, or the batch has to shrink. Once memory is enough, pick the compute tier from how long each step may take.

More compute does not help if the model does not fit

The disks have to feed the cards

Random reads of small files are a poor fit for spinning disks. Keep the dataset on NVMe. CPU threads and memory need to match as well.

A card waiting on data is still billed as if it were busy

A whole card, not a slice

These are physical GPU servers. The whole card is yours, so memory and compute are not shared with another job.

The result you measure is not split with someone else

Power and cooling have to match the cards

High-power cards depend on the room power quota and the cooling. Without quota you cannot add cards. Weak cooling slows them down on a long full load.

More cards do not raise the result if power or heat is the limit

Which jobs belong on a GPU server

From one-card inference to eight-card training, each job points to a kind of machine.

Fit

AI inference

Typical case

Online requests are sensitive to GPU memory and latency. Too little memory forces a smaller batch.

How to size it

Start with one RTX 4090, or four RTX 5090 cards for concurrency. Confirm memory with the real model first.

Fit

Training and fine-tuning

Typical case

This needs card-to-card links, a lot of memory and fast storage. Jobs run for days, so one interruption wastes the queue time.

How to size it

Use eight RTX 4090 cards, or eight H100 cards. The links between cards, PCIe lanes and CPU threads have to match.

Fit

Teaching and experiments

Typical case

Classes and experiments need compute for a short time, and the machine should be released when the job ends.

How to size it

Use a one-card entry machine. Monthly rental can be released when the work ends.

From the job queue to the room power

Jobs enter a queue and are placed on whole cards. The GPU pool runs as many cards as the job needs. NVMe feeds the data. Power and temperature decide whether a long full load can hold.

From the job queue to whole cards and NVMe Training and inference enter a queue, then land on whole cards with the driver and framework. The GPU pool runs from one card to eight. NVMe loads the data and writes the result. Low power quota or high temperature limits both extra cards and a long full load. Jobs Schedule GPU pool Data Room Schedule Compute Power Room InferenceOnline requests TrainingMany cards, long run TranscodeBatch jobs Memory shortThe model will not fit Whole-card scheduleNot split DriverInstalled after delivery FrameworkA common runtime Job queuePlaced by card count GPU serverA physical machine One to four cardsInference and tests Eight cardsTraining and simulation Power shortNo more cards DatasetHot data NVMeKeeps feeding the cards Result writeRAID protection Temperature watchAvoid a thermal slowdown Power watchWatch the power quota Redundant powerFans and cooling Job recordAn interruption can be checked
  • Jobs and data
  • No more cards without power quota
  • Driver, framework and storage protection

What the GPU server includes

Cards, memory, storage, nodes and the room, listed so the machine can be chosen from the job size.

  • 18 machines are on sale, in Dallas, Seattle, Los Angeles, Ashburn, Chicago, Tokyo and Singapore
  • Card count and model, CPU, memory, disk, defense and IPv4 that are not listed can be configured to order
GPUs
RTX 4090, RTX 5090, H100 and H200. From one card to eight in parallel. The whole card is dedicated and not split.
Processor and memory
Memory runs from 96 GB to 2048 GB. With several cards, CPU threads need to match the PCIe lanes and the card count.
Storage
Disks are mainly NVMe and SSD, up to 19.2 TB, with RAID available. Do not keep hot data on spinning disks.
Nodes
On-sale machines are in Dallas, Seattle, Los Angeles, Ashburn, Chicago, Tokyo and Singapore.
Power and cooling
Redundant power, fans and storage controllers. The room provides precision cooling and power, and watches power and temperature.
Delivery and runtime
A standard setup is delivered in 30 to 60 minutes. A custom setup takes 1 to 2 workdays. We help install the GPU driver and a common runtime.

Recommended GPU servers

Cards, memory, disks and prices follow the product page. On-sale machines run from one card to eight.

Role / model CPU Memory Disk Route Bandwidth Defense IPv4 Price Order
US-DAL-GPU-4090x1-i9-14900K Core i9-14900K·24C / 32T 96G 2TB NVMe Global BGP 1G / 不限流量 10G 1 IP $799 /mo Order
US-DAL-GPU-5090x4-75F3x2 EPYC 75F3 x 2·64C / 128T 512G 960GB SSD×2 + 8TB NVMe×2 Global BGP 10G / 不限流量 10G 1 IP $1459 /mo Order
US-SEA-GPU-4090x8-7763x2 EPYC 7763 x 2·128C / 256T 512G 960GB SSD + 3.84TB NVMe Global BGP 1G / 不限流量 10G 1 IP $3369 /mo Order
US-DAL-GPU-5090x8-9354x2 EPYC 9354 x 2·64C / 128T 1024G 960GB SSD×2 + 8TB NVMe×2 Global BGP 10G / 不限流量 10G 1 IP $4669 /mo Order

The whole card is dedicated and not split. GPU memory is a hard limit. If the disks cannot feed the cards, GPU use drops while the machine is still billed. Several cards also depend on the links between them, PCIe lanes and the power quota. More cards are not always a matching speedup.

Prices follow the product page. Quarterly billing is 5 percent off, half-year is 10 percent off, yearly is 15 percent off, and renewal uses the same price. A one-card entry machine at $799 per month is $8,149.8 per year, which is $1,438.2 less than $9,588 paid month by month. Card count and model, CPU, memory, disk, defense and IPv4 that are not listed can be configured to order.

Which machine: from inference to eight-card training

Each job has a hard limit to check first, then a direction for the machine. The card count follows the product page.

Job Check first Machine direction
AI inference Online concurrency is sensitive to memory and latency One RTX 4090, or four RTX 5090
Training and fine-tuning Card links, large memory, NVMe Eight RTX 4090, or eight H100
Transcoding and rendering Large GPU memory plus many CPU cores Eight RTX 4090, 512 GB of memory or more
Workstation and remote desktop GPU acceleration and a remote session Four or eight RTX 5090
Scientific computing Memory, storage throughput, and power quota Eight H100 or H200, memory up to 2048 GB
Teaching and experiments A short run that should be released One entry card, released after the month

Several cards are not just a full chassis. If space, power, the links between cards and PCIe lanes do not match, more cards are not a matching speedup. Keep hot data on NVMe. You can ask for a test machine and check memory, step time and data loading with the real model and dataset.

Capabilities

The card is only one part. Exclusive use, storage supply and the room decide the output as well.

Compute leaving the data center toward the job

From a dedicated card to the room, delivered item by item

Physical GPU servers keep the whole card, with no split. Card model, count, CPU, memory and disks follow the on-sale spec. Hot data sits on NVMe, with RAID available. Terms run from a month to a year, and the machine can be released when the job ends. The room has redundant power and precision cooling, and it watches power and temperature.

Physical GPU servers. The whole card is not split, so memory and compute are not taken by another job.

What it means for a compute project: The measured result is not discounted, and it can be repeated.

Card model and count, CPU cores and threads, memory and disks follow the on-sale machine.

What it means for a compute project: You know the card and the count before you order.

Disks are mainly NVMe and SSD, up to 19.2 TB, with a RAID array available.

What it means for a compute project: Data supply does not hold the cards back.

Monthly, quarterly, half-year and yearly terms are available. The machine can be released when the job ends.

What it means for a compute project: Rent for the project, not a locked year.

Redundant power and fans, precision cooling, and continuous watch on power and temperature.

What it means for a compute project: A long full load is less likely to slow down from heat.

Support

Training jobs often run for days. One hardware or operations interruption wastes the time already spent in the queue.

First reply within 30 minutes on workdays

Nights and weekends cover outages only. A stopped job or a hardware fault is followed up.

Standard delivery in 30 to 60 minutes

A standard setup is delivered in 30 to 60 minutes, and the runtime can be installed after that. A custom setup takes 1 to 2 workdays.

Help with the runtime

We help install the GPU driver and a common runtime, so the slowest setup debugging is not left to you.

Redundant storage

An SSD RAID array. One failed disk does not have to take the whole machine data with it.

99.9 percent availability target

Network availability targets 99.9 percent.

Change it as the project changes

Card count, memory, disks and bandwidth can change with the stage of the project.

Tell us the job, and we will recommend the cards

Job type, model size, dataset size, how long it should run, and concurrency. From that we recommend the machine, the matching spec and a price.

  • The card and the matching spec follow the job
  • Whole cards, not split. Model and count follow the job size
  • Help with the driver and the runtime
  • First reply within 30 minutes on workdays. The machine and the spec can change
View products

Frequently asked questions

Check GPU memory first, then compute. Too little memory means the model will not load, or the batch has to shrink. That is a hard limit. Once memory is enough, pick the tier from step time.

These are physical GPU servers. The whole card is dedicated and not split. Memory and compute are not shared with another customer.

Several cards are not just a full chassis. Space and power have to hold full-height, dual-slot cards. The links between cards and the PCIe lane count change the result. If those do not match, more cards are not a matching speedup. Without power quota you also cannot add more cards.

Yes. Training keeps loading data. Random reads of small files are a poor fit for spinning disks. When the disks cannot feed the cards, GPU use drops while the machine is still billed. Keep hot data on NVMe.

The machines sit in a professional room, with redundant power, fans and storage controllers. The room provides precision cooling and power, and it watches power and temperature, so heat is less likely to slow the cards.

Monthly rental fits a short job with a sharp peak, such as tuning and comparison runs, and the machine can be released when it ends. Ongoing inference or continuous training can use a quarter, half a year or a year. Quarterly billing is 5 percent off, half-year is 10 percent off, yearly is 15 percent off, and renewal uses the same price.

Yes. Ask for a test machine and check three things with the real model and dataset: whether GPU memory is enough, whether step time is acceptable, and whether data loading is the limit.

A standard setup is delivered in 30 to 60 minutes, and the runtime can be installed after that. A custom setup takes 1 to 2 workdays. We can help install the GPU driver and a common runtime.

Prices follow the product page. Quarterly billing is 5 percent off, half-year is 10 percent off, yearly is 15 percent off, and renewal uses the same price. A one-card entry machine at $799 per month is $8,149.8 per year, which is $1,438.2 less than $9,588 paid month by month.

Yes. Card count, memory, disks and bandwidth can change with the stage of the project. Before adding cards, confirm chassis space, power, PCIe lanes and the room power quota. Otherwise the speedup may not match the extra cards.